|
|
 |
|
American University
Numerous Campus
Wide Projects
Anderson Hall,
Troubleshoot and Balance
Beeghley and Hurst Halls,
Chemical Fume Hood T&B
President’s Office, Survey and
Balance
Washington D.C. |
|
Anne Arundel Medical Center
Troubleshoot Existing Chilled
Water System
Annapolis, Maryland |
|
Association for Assessment and Accreditation of Laboratory Animals (AAALAC)
Animal room certification
National Institutes of Health Facilities -
Ongoing |
|
Ballston Commons Mall
Arlington, Virginia |
|
The Baltimore
City Community
College
Survey of
Chemical Fume Hoods
Baltimore, Maryland |
|
The Baltimore
City Jail
Adjustments of
Air Systems to Comply with
Health Department Requirements
Baltimore, Maryland |
|
The Baltimore
Sun Papers
Accounting
Department
Renovations to Various Floors
(Conversion to VAV)
Washington D.C. |
|
Bon Secours
Hospital
T&B Renovated Building and
Systems
Troubleshoot System Serving
Cardiac Care Unit
Baltimore, Maryland |
|
Cardinal Sheehan Center for the Aging
T&B of New Systems in
Renovated Structure
Columbia, Maryland -
Ongoing |
|
The Cathedral of Mary our Queen
Baltimore, Maryland |
|
Columbia Corporate Centers
Columbia, Maryland -
Ongoing |
|
Deaton Hospital & Medical Center
T&B of New Wing
and Connecting Systems
Baltimore, Maryland |
|
Forever 21
Stores
Maryland |
|
Fort George G.
Meade
Numerous Campus
Wide Projects
Fort George G. Meade, Maryland |
|
Franklin Square Hospital
T&B of New Surgical and
Procedure Suites
Baltimore, Maryland |
|
Gerontology Research Center at
Johns Hopkins Bayview Medical Center
Baltimore, Maryland |
|
Howard Community College
Technical Arts Building
Columbia, Maryland |
|
Howard University
Performance Test of High
Pressure/Flow Combustion Air
Fans For Central Plant
Boilers
Just Hall Animal Facility
Washington D.C. |
|
Kimbrough Army & Community
Hospital
Balancing of Systems to
Provide Proper Pressure
Relationship Within the
Surgical Suite
Re-evaluating these Systems
on a Yearly Basis
Fort Meade, Maryland |
|
Lees' Ice Cream Stores
Maryland |
|
Loch
Raven Senior High School
Baltimore, Maryland |
|
The Lyric Opera House
Baltimore, Maryland |
|
McDonough
Crossroads
Troubleshoot Existing Chilled
Water System
Pikesville,
Maryland |
|
Motor Vehicle
Administration (MVA)
Survey of High pressure Air
System
Baltimore,
Maryland |
|
NASA's Goddard Space Flight Center
PBI has completed over 400 projects
at NASA Goddard of
varying sizes
Building 22, Alterations
for Terrestrial Physics
Laboratory
Building 5, Room E-90,
modifications for Class
10,000 Clean Room
Building 29, High Bay
Area, Telerobotics
Service Operations
Building 9, Locker Room
Renovations
Performance Testing of
Laminar Flow Diffuser
Prior to Design of HVAC
System for Class 100
Clean Room
Restorations of
Buildings 3, 13, & 14
Greenbelt, Maryland |
|
National
Cancer Institute
Study
Airflow Deficiencies in Bio-safety
Level 3 Facility
Troubleshoot Double Duct Boxes
Fort Detrick, Maryland |
|
National
Institute of Environmental Health
Services
Survey and Tests of High Temperature
Hot/Chilled Water Systems
Triangle Park, North Carolina |
|
National Institutes of Health
Building 9, Upgrade of Animal
Rooms
Building 10B, ACRF Animal
Facility
Building 10, Clinical Pathology
Building 10, Test & Adjust
Tuberculosis Rooms
Building 10, ACRF-93, AAALAC
Compliance
Building 10, Nuclear Medicine,
Air Balance
Building 10/5B, Test Exhaust
Fans
Building 10, A-Wing, Evaluation
of Air Handling Unit
Building 10, B1 Autoclave,
Exhaust Evaluation
Building 10, J-Wing, Survey
Supply and Exhaust
Building 10, E-Wing, Exhaust
Survey
Building 10, F-Wing, Air Survey,
Risers RF, UF, & VF
Building 10, Induction Unit Performance Tests
Building 10, C-Wing, Duct Tests
Building 10, HLA Lab Tests
Building 10, Catheterization Lab
Survey
Building 10, Survey of Surgical
Suite for As-Built
Building 10, Survey of Material
Handling Tower
Building 10, J-Wing, Balance
Supply and Exhaust
Building 10, Renovations of
Cafeteria
Building 11, Incinerator
Ventilation Study
Building 14F, Animal Facility
Building 29, 29A, 30, 36, & 37,
Consolidated HVAC Survey
Building 37, Survey of HVAC
Systems
Building 82, Investigate AHU for
Source of Vibration
Building 10A, Member of
Comprehensive Management Team
Overseeing All
Construction/Renovation Projects
-
During the modernization &
Expansion of the CCC/EMS
(estimated 7 years)
Executive Plaza, Survey and
Recommendations
Westwood Building, IAQ, Survey
and Recommendations
All Facilities, AAALAC
Accreditation
Bethesda, Maryland -
Ongoing |
|
The
National Museum of Women in the Arts
Washington D.C. |
|
Northrop Grumman Electronic Systems
Numerous Campus
Wide Projects
Linthicum, Maryland -
Ongoing |
|
Northrop Grumman
Sykesville, Maryland |
|
Northrop Grumman
Undersea Systems
Annapolis, Maryland |
|
Northrop Grumman Forbes Building
Lanham, Maryland |
|
Owings Mills Towne
Center
Owings Mills, Maryland |
|
Peabody Conservatory
Baltimore, Maryland |
|
Sinai Hospital
Accounting Department
Relocation
Chiller Replacement
Troubleshoot Existing Hood Exhaust
System, Correct Deficiencies
Baltimore, Maryland |
|
Security Square Mall
Testing & Balancing of Smoke
Evacuation Systems
Testing 7 Balancing of Renovated
Mall Areas
Baltimore, Maryland |
|
Social Security, Westwood Building
Investigation of Hot
Water heating System Deficiencies
Baltimore, Maryland |
|
Springfield Mall
Test and Troubleshoot
Existing Smoke Evacuation Systems
Springfield, Virginia |
|
University of Maryland, Baltimore
County
Chemistry/Physics Lab
Renovations
Baltimore, Maryland |
|
VA Medical Center
T&B High
Pressure Induction Systems
Serving Patient Areas
Charleston, South Carolina |
|
VA Medical Center
T&B Renovated Areas
Including Surgical Suites &
ETO Systems
Washington D.C. |
|
VA Medical Center
Survey of Air Systems
Clarksburg,
West Virginia |
|
VA Medical Center
Investigation
of Improperly Balanced
Systems
Martinsburg,
West Virginia |
|
Winterthur Museum
Renovations to Research
Building
New Exhibition Building
Emergency Chilled Water
Testing
HVAC Upgrade, Main Museum
(DuPont Mansion)
Winterthur,
Delaware |
|
|
 |
|